How Sudon Brothers builds a custom home

Building a custom home with Sudon Brothers happens in five stages: a first conversation and site visit, design with an architect, selections and pricing, construction, and a final walkthrough. The same family stays with you the whole way. An architect we work with draws the plans, Donald Sudon and our general contractor oversee construction, and our Girard office keeps you informed.

The five stages

Each stage ends with something you can see and approve before the next one begins.

Start with a conversation
  1. Conversation and site visit

    We start with how you live: who's in the house, how you cook and entertain, what you need now and in ten years. Then we walk your land, or help you evaluate a lot before you buy, looking at slope, drainage, sun, access, utilities and zoning setbacks. You leave with an honest sense of what the land allows and what a home like yours involves.

  2. Design with an architect

    An architect we work with turns that conversation into illustrated plans and elevations, down to where your furniture and appliances go. You review them, mark them up and change them until the house fits.

  3. Selections and pricing

    With plans settled, you choose exterior materials, cabinetry, flooring, fixtures and any estate features with help from our office team. The home is then priced from your actual plans and selections, so the number reflects your design rather than a base model with upgrades.

  4. Permits and construction

    We coordinate zoning approval, building permits, utility connections and inspections, then build. Donald and our general contractor oversee the site with long-standing trades, keeps notes on every detail and keeps the job site clean. Our office keeps you updated and helps with things like contacting utility companies.

  5. Walkthrough and beyond

    Before you move in, we walk the finished home with you and take care of anything that isn't right. After closing, we stay reachable, and we stand behind the work.

What happens during construction

Every custom home moves through the same major phases. Here's what each one involves.

Site work and foundation

Clearing, grading, utility trenches and the foundation. Most homes in Northeast Ohio are built on full basements, which also house mechanical systems and often become finished living space.

Framing

Floors, walls and roof go up and the house takes shape. This is when rooms, ceiling heights and window views become real.

Mechanical rough-ins

Plumbing, electrical, heating and cooling run through the open walls, along with low-voltage wiring for networking, audio and security.

Insulation and drywall

The house is insulated and closed in, then drywall is hung and finished.

Interior finishes

Cabinetry, trim, flooring, tile, counters, fixtures and paint. This is the longest and most detailed phase.

Exterior and final steps

Driveway, walks, final grading and landscaping, followed by final inspections and your walkthrough.

How long does it take?

Timing depends on the size and complexity of the home, the season you break ground, and how quickly selections are made. We set a schedule with you before construction starts and keep you updated against it.

Design usually moves fastest when you bring a clear picture of how you live and any inspiration you've collected. Decisions made early, especially on structure, windows and exterior materials, keep construction moving.

Paying for a custom home

Most clients use a construction-to-permanent loan. The lender pays the builder in stages, or draws, as construction is completed and inspected, and the loan converts to a standard mortgage when the home is done. Lenders need finished plans, specifications and a construction budget to approve the loan, which is part of what our design and pricing stages produce.

Read the cost guide

Common questions about the process

How long does it take to build a custom home?
It depends on the size and complexity of the home, the season you break ground and how quickly selections are made. Design and permitting come first. We set a construction schedule with you before work starts and keep you updated against it.
Can I make changes to the plans?
Yes. Plans are reviewed and revised with you before construction. One homeowner wrote that “a set of illustrated plans was prepared and we were able to make changes to suit our needs.”
Will I know what's happening during construction?
Yes. Donald Sudon and our general contractor oversee every job, and our full-time office keeps you informed and answers questions. As one client family put it: “You always kept us informed and updated on everything.”

Start with a conversation.

Tell us about your land and what you're picturing. We'll walk you through what building with us looks like.